STEP-01
Architecture Session — Scheduled within 48 hours of brief approval. Architect reviews vision, confirms scale, and opens Work Package 001.
STEP-02
Architecture Session defines the system blueprint. No engineering begins before the blueprint is reviewed and approved.
STEP-03
PRESENCE Adapter — If PRESENCE integration is required, the adapter Work Package is opened in parallel with core engineering.
STEP-04
10-Gate Verification — Every product exits the Factory through 10 verification gates before production status is assigned.
STEP-05
Deployment to Sovereign Infrastructure — Production deployments land on Swelerion PrexCloud or Fortress. No third-party hosting for production systems.